Cracked Fiberglass Skylights
Sun and cold make old panels brittle, and hairline cracks open at each screw where water drips onto stored goods below.

As a Brazil metal roof coating contractor, we coat steel roofs on shops, storage buildings, and light industrial plants, working around the skylight rows they carry.
Brazil metal roof coating jobs often start at the light panels. Many shop and storage roofs in Clay County carry rows of fiberglass skylights set between the steel sheets, and those panels age faster than the metal around them.
Yellowed panels crack at their screws, leak along their side laps, and turn brittle enough to break underfoot. Before any coating goes on, each panel is either kept and sealed, swapped for a new one in the same rib profile, or covered with a guard.

Four conditions show up again and again on Brazil shop and storage roofs. Each one gets handled before the field coat.
Sun and cold make old panels brittle, and hairline cracks open at each screw where water drips onto stored goods below.
Where a light panel overlaps the steel, the sealant tape dries out first, letting rain run along the rib into the building.
Freeze and thaw cycles work screws loose along purlins, so washers stop sealing and rust rings form around each head.
Leaves from nearby tree lines fill eave gutters, and backed-up water creeps under the bottom edge of the panels.
Coating a Brazil shop roof brings four results that owners of storage and light industrial buildings notice first.
New or sealed light panels keep bays bright without the drips that came with the old ones.
Fabric and coating cover the steel laps and the skylight laps in one film across the roof.
Primer and topcoat seal the bare spots along ribs and eaves where corrosion had started.
Inventory, equipment, and vehicles under the roof stop catching drips during spring storms.
Five systems cover the roofs we see around Brazil. Each card notes where that system fits on local shop and storage buildings.

Exposed-fastener steel on shops along US 40 gets rust treatment, new screws, sealed laps, and two coats measured for thickness.
Metal roof coating in BrazilFlat office wings attached to a metal shop hold puddles after storms, so silicone covers those sections in Brazil.
Silicone roof coating in Brazil
Steep storage roofs that drain within hours suit primer and two acrylic coats, which keep later recoats simple.
Acrylic roof coating in Brazil
Drafty shops with leaks at many laps get spray foam for insulation and coverage, sealed under a topcoat.
Spray foam roofing in Brazil
Shingle slopes on offices and churches in town can be coated when the tabs still lie flat and attached.
Shingle roof coating in BrazilCall before the next storm. We look at each light panel and the laps around it and tell you which ones can stay.
(930) 346-3203Skylight work fits into the same five steps we follow on every steel roof, starting with the walk.
We walk the panel runs, check every skylight for cracks and loose screws, and photograph laps, eaves, and gutters for the scope.
Each skylight is marked keep, replace, or guard. Replacements are ordered in the same rib profile so they lap cleanly into the steel.
Pressure washing removes chalk and grime, and rusted ribs and screw heads get primer once the roof dries.
Panel laps, skylight edges, and screw heads get mastic and fabric so the coating has a solid base at every joint.
Base and top coats cover the steel and stop at the skylight edges, with wet-film readings taken across the field.
We also coat commercial roofs in these towns. Outside them? call us or send us a message.
Underside drips sorted into condensation or real leaks first.
Metal roof coating in LintonRidge caps, rake trim, and closures refastened before coating.
Metal roof coating in ClintonNewer panels checked against the maker warranty terms.
Metal roof coating in PittsboroOld coatings and mastic tested for grip before recoating.
Metal roof coating in SullivanYes. We coat steel roofs on shops, warehouses, and storage buildings in Brazil and around Clay County. Each job begins with a walk of the panels, screws, skylights, and gutters, and the coating plan is sized to what we find.
More metal roof coating answersWater that sneaks under a loose screw or an open lap freezes, expands, and pries the joint a little wider every cycle. A continuous coating closes those entry points, so we spend extra time on screw heads and end laps before the field coat.
Cracked or brittle panels should be. Panels that are still clear and firm can stay and get their laps sealed into the coating. We mark each one on the roof plan so you can see the count before pricing.
No. Coating a light panel blocks the daylight it was installed for. The coating stops at the panel edges, and the laps between panel and steel are sealed instead.
On roofs that maintenance crews walk often, yes. Guards or screens over brittle panels reduce the fall hazard, and they go on while the crew and lift are already set up.
The calculator range runs about $2.50 to $4 per square foot of roof. The number of skylights to replace, screws to swap, and gutter repairs needed decide where a building lands in that range.
It depends on the roof size, the number of skylights to replace, and the weather. Replacement panels are ordered after the walk, and steel away from the skylights can be prepped while they arrive, so the job keeps moving on dry days.
Steel eave gutters with rust inside can be cleaned, primed, and coated along with the roof. Badly rusted or undersized gutter sections are flagged in the scope for replacement before the coating reaches the eaves.
Send the roof size and a count of the skylight panels if you know it. We walk the roof and send photos with a written scope.